Image (220x100)


In order to evaluate and comment ideas you need to be part of the community.
Join community now.

Image (80x25)Image (400x283)Image (141x141)Image (141x138)Image (143x101)Image (319x239)

additional attachment(s):

extension ...ertrag_musterbeispiel_D.pdf

1st BIOMIEWERK 2MW ( Biopower 3rd generation )

Short description (max. 250 characters)
BIOTHETIC PETROLEUM PRODUCTS
from
BIOMASS(->BIOCOAL), AIR AND WATER
in
AUTONOMUS ENERGY SYSTEMS

Key benefits (max. 250 characters)
GO_POINT 2024 / DATE 12/ 2024
The GO_POINT is the time where our new BIOPOWER
ENERGY and CHEMICALS can compete with the old energy and chemicals in relation to the expectations of our BUSINESS and the FUEL TAXES in Germany.

Detailed description (max. 500 words)
The feasibility study is based on the knowledge by experience in the production of qualitatively good bio coal with the name: STANDARD BIOCOAL. To produce STANDARD BIOCOAL we need a special thermodynamic reactor construction that reliable and economically works. This special thermodynamic reactor construction is given the name CARBONATOR_SYSTEM.
AGIC ENERGY UG ( Damir Agic ) has brought the CARBONATOR_SYSTEM on plan and simulation.
Moreover the feasibility study also is based on the coal liquefaction after the FISCHER- TROPSCH PROCESS
ENGINEERING ( year 1925 ) and hundreds further projects. The FISCHER- TROPSCH PROCESS ENGINEERING were find in thousands old documents. Which PROCESS ENGINEERING for the 1st BIOMIEWERK the effective and economic is that were finding and development further.



Tags:
biocoal, bioenergy, biofuels, biomass, chemicals, chemistry, energy, energy system, htc, natural energy, new enery, power system, powerplant, renewable energy

Categories:
Factory of the future, Energy storage, Renewable energy

Initiator

Status

Status: in discussion

66 times viewed

1 Comment(s)


Number: 000083

submitted: 09.07.2012